US 60 Cumberland River Bridge is a Float-In Wonder
US 60 Cumberland River Bridge is a Float-In Wonder https://www.americanbridge.net/wp-content/themes/corpus/images/empty/thumbnail.jpg 150 150 American Bridge https://www.americanbridge.net/wp-content/themes/corpus/images/empty/thumbnail.jpgIn September, American Bridge Company, as a dedicated subcontractor to Jim Smith Contracting, completed the assembly and float-in of the new US 60 Cumberland River Bridge. The Kentucky Transportation Cabinet slated the aging truss for replacement but needed to limit impacts to navigational traffic on the busy waterway. American Bridge assembled the 700-foot, 2,800-ton truss…
read more