Completion Date:
November 15, 2011
This project involved the replacement of about 70,000SF (6,503SM) of open steel grid deck with new steel grid deck, plus replacement of all bridge handrails, roadway lights and other miscellaneous repairs. The work was done during one-lane closures, with traffic control using temporary lights. The work was undertaken using an overhead gantry system. The structure was originally constructed by American Bridge in 1960. |