Tappan Zee Hudson River Crossing Project
Tappan Zee Hudson River Crossing Project
Est. Completion Date: 2018-05-31

This contract involves the new construction of two, three-mile, parallel, twin, cable-stay bridges. Each of the bridges will consist of a 2,200’ (671m) mainspan, three miles of concrete piers and steel girder approach spans. American Bridge will...

Forth Replacement Crossing
Forth Replacement Crossing
Est. Completion Date: 2016-12-22

This project will replace a 6km segment of the A-90 over the Firth of Forth near Edinburgh, Scotland. Approximately 2.6 km of this replacement represents a major bridge crossing of two ocean shipping and military navigation channels. This bridge...

Hurricane Deck Bridge
Hurricane Deck Bridge
Est. Completion Date: 2014-05-01

This project involves the replacement of a 2,281' deck truss bridge over the Lake of the Ozarks on State Route 5 in Camden County, Missouri. AB used a bold and innovative ATC approach to win the project. The proposed structure is a 2,260' long...

San Francisco/Oakland Bay Bridge Self Anchored Suspension Superstructure
San Francisco/Oakland Bay Bridge Self Anchored Suspension Superstructure
Est. Completion Date: 2014-02-03

The American Bridge/Fluor Joint Venture (AB led) is prime superstructure contractor for this new 2,051' (625m) single-tower, self-anchored suspension bridge. The steel tower is 525' (160m) tall, composed of four legs strutted together. The 1,854'...