Chincoteague Bridge Route 175
Completion Date: 2012-12-22
This project includes the construction of a 59-span, 4,764' (1,452m), environmentally sensitive replacement bridge for Virginia Route 175 connecting the mainland to Chincoteague Island. The two-lane, 43'-4" (13.2m) wide bridge utilizes typical 80'... |
|
Platt Street Bridge Major Repairs
Completion Date: 2012-07-27
The structure is in the Platt Street Bascule Bridge crossing over the Hillsborough River in Tampa, Florida. This project involved repairs, replacement and restoration of the bascule lifting mechanism, control equipment, electrical, bridge leaf... |
|
Marine Parkway Bridge Repairs and Replacements
Completion Date: 2009-03-28
This project involved structural steel repairs to an existing deck truss bridge and it’s through truss main span lift section, including replacement of upper laterals, 7,500 lacing bars on truss chord members, chord batten and bracing gusset... |
|
Woodrow Wilson Bridge Bascule Spans
Completion Date: 2008-03-03
This contract involved the construction of the main three spans of this new 35 span crossing. This included an eight leaf trunnion bascule with a main span of 270' (82.29m) and flanking spans of 144.5' (44m). The ribs are 120' (37m) from base to... |
|