Bulkhead at NOAA Marine Operations Center
Bulkhead at NOAA Marine Operations Center
Completion Date: 2012-05-08

The scope of work for this project included the design and construction of 800LF of sheet pile bulkhead with concrete cap and fendering system.

Container Yard Shoreline Protection Works
Container Yard Shoreline Protection Works
Completion Date: 2012-03-07

This project involved an armor stone revetment for an exposed shoreline adjacent to a container port.

U.S. Navy Pier 31 Groton
U.S. Navy Pier 31 Groton
Completion Date: 2012-02-29

This design-bid-build, best value, U.S. Navy project was for the construction of a new navy submarine pier 67' by 550' (20m by 168m). The pier is founded on 36" (914mm) steel pipe piles, some with 2' rock sockets, which were driven, excavated and...

Castaway Cay Enhancements (2011-2012)
Completion Date: 2012-01-15

This project involved the renourishment, reinstallation and replacement of Castaway Cay damages caused by hurricane Irene.

Items 1-4/79 displayed. | 1 | | 2 | | 3 | | 4 | | 5 | | 6 | | 7 | | 8 | | 9 | | 10 | next
 
 