Bulkhead at NOAA Marine Operations Center
Completion Date: 2012-05-08
The scope of work for this project included the design and construction of 800LF of sheet pile bulkhead with concrete cap and fendering system. |
|
U.S. Navy Pier 31 Groton
Completion Date: 2012-02-29
This design-bid-build, best value, U.S. Navy project was for the construction of a new navy submarine pier 67' by 550' (20m by 168m). The pier is founded on 36" (914mm) steel pipe piles, some with 2' rock sockets, which were driven, excavated and... |
|
Castaway Cay Enhancements (2011-2012)
Completion Date: 2012-01-15
This project involved the renourishment, reinstallation and replacement of Castaway Cay damages caused by hurricane Irene. |
|