Halogaland Bridge TENDER
Completion Date: 2013-06-05
American Bridge is currently preparing a bid for this contract, which will include providing the steel and cables for a 1,145m suspension bridge with 18.6m by 3m OBG. The contract will involve only the cables and steel mainspan deck supply and... |
|
SAS Cable Bands - Fab
Completion Date: 2013-06-05
This project involves providing fully detailed fabrication drawings and 16 supplemental cable band collars. |
|
Granton Rancheria - Fab
Completion Date: 2013-06-01
This project consists of the fabrication and installation of a five floor concrete parking structure. |
|
CCO 2450 Skyway Traveler Rail Replace - Fab
Completion Date: 2013-05-31
This project involves a skyway traveler rail replacement which includes fabricating the traveler rail and supplying galvanized bolts, teflon and neoprene. |
|