|
Point Marion Truss Bridge SR0088
Completion Date: 2009-06-30
As a subcontractor to sister company American Bridge Manufacturing, American Bridge erected the 412'-6" Parker Truss span over the main channel for this 746', new, four-span bridge over the Monongahela River. The prime contractor was Swank... |
|
Cross Seminole Trail Bridge over U.S. 17-92
Completion Date: 2008-04-25
This design/build project includes construction of 1,204' (367m) of pedestrian/bicycle trail including a 15-span, 698' (213m) bridge that features a 208' (63m), 135 ton (122mt) serpentine shaped steel through truss main span over U.S. Highway... |
|
Lake Cumberland Bridge, Kentucky Rt. 90
Completion Date: 2006-06-27
This project included a new 1,712' (522m) bridge over Cumberland Lake in Eastern Kentucky. The four-lane bridge included a 1,572' (479m) two span continuous steel truss that is 130' (40m) tall at the center and has a vertical clearance of 84'... |
|
Chicago Skyway Calumet River Bridge Rehabilitation
Completion Date: 2003-07-18
This project involved the structural steel rehabilitation of a nine-span steel truss bridge consisting of 3 by 178' deck truss approach, 325' + 650' + 325' cantilevered through truss main span unit, and 3 by 208' approaches on the other side for a... |
|