Snake River Bridge at Lyons Ferry
Completion Date: 1968-05-01
Relocation of the Columbia River Bridge at Vantage Ferry, Washington, to accommodate the Lower Monumental Lock & Dam project. The two-lane, steel cantilevered bridge, now called the Lyons Ferry Bridge, carries State Route 261 over the Snake River. |
|
Guy A. West Pedestrian Bridge
Completion Date: 1966-11-10
This contract was for the supply and erection of a 744’ (227m) pedestrian-only suspension bridge over the Sacramento River. The scope of work included the supply, fabrication, and erection of two 86’ (26m) welded steel plate towers and two main... |
|
Tagus River Bridge - Road Deck
Completion Date: 1966-08-06
This project entailed the financing, design and construction of a 10,573’ (3,223m) crossing of the Tagus River located about 7.5mi (12km) from its mouth at the Atlantic Ocean. The work included a 14 span, 3,100’ (945m) segmentally cast in place... |
|
Astoria Bridge over the Columbia River
Completion Date: 1966-05-01
This project involved the fabrication and erection of a 2,464' cantilevered truss and involved all of the approaches and roadway deck for the longest self-supported continuous truss in the world. |
|