Home > Experience
 

About Us
Experience

    Featured Projects
    Current Projects
    Completed Projects
       - Arch
       - Cable Stay
       - Girder
       - Movable
       - Suspension
       - Truss
       - Marine
Media


Angostura (Orinoco River) Bridge
Angostura (Orinoco River) Bridge
Completion Date: 1967-04-27

American Bridge performed under a subcontract from Precompromido, S.A. for work on this 5,509’ (1,679m) crossing of the Orinoco River in remote Ciudad Bolivar, Venezuela. AB’s scope included preliminary and final design of the bridge, fabrication...

Guy A. West Pedestrian Bridge
Guy A. West Pedestrian Bridge
Completion Date: 1966-11-10

This contract was for the supply and erection of a 744’ (227m) pedestrian-only suspension bridge over the Sacramento River. The scope of work included the supply, fabrication, and erection of two 86’ (26m) welded steel plate towers and two main...

Tagus River Bridge - Road Deck
Tagus River Bridge - Road Deck
Completion Date: 1966-08-06

This project entailed the financing, design and construction of a 10,573’ (3,223m) crossing of the Tagus River located about 7.5mi (12km) from its mouth at the Atlantic Ocean. The work included a 14 span, 3,100’ (945m) segmentally cast in place...

Throgs Neck Bridge
Throgs Neck Bridge
Completion Date: 1961-08-17

This project included the supply and erection of the main cables, suspender ropes, and suspended structure and decks on anchorages for a 2,910' (887m) suspension bridge with a 1,800' (549m) mainspan. The two main cables are 22 7/8" (581mm) in...

Items 21-24/46 displayed. prev | 1 | | 2 | | 3 | | 4 | | 5 | | 6 | | 7 | | 8 | | 9 | | 10 | next
 
 
© 2009 American Bridge Company