Chesapeake Bay (William Preston Lane) Bridge Redecking
Completion Date: 2010-10-29
This design-bid-build project involved the removal of 193,000SF of deck in the westbound suspension and through cantilevered truss spans; and replacement with precast, post tensioned units during nighttime lane closures. The work also included the... |
|
Bronx-Whitestone Bridge Structural Improvements
Completion Date: 2010-09-30
This project was for construction services for structural improvements for the Bronx-Whitestone Bridge over Long Island Sound in New York City. The suspension bridge is 3,868’ long with six lanes. The work on the bridge included the fabrication... |
|
Williams Pipeline Bridges
Completion Date: 2010-02-28
This project involved the replacement of the main and suspender cables, saddles and anchorages on two gas pipeline suspension bridges. The Colorado River Bridge has a mainspan of 550' (167.7m) and a total cable length of 1,190' (362.8m), and the... |
|
Angostura Bridge Engineering Services
Completion Date: 2008-12-31
American Bridge provided technical assistance services to the design-build contractor, Consorcio Puente Angostura, for the rehabilitation of this 712m suspension bridge. This included the development of means and methods, work procedures,... |
|