Home > Experience
 

About Us
Experience

    Featured Projects
    Current Projects
    Completed Projects
       - Arch
       - Cable Stay
       - Girder
       - Movable
       - Suspension
       - Truss
       - Marine
Media


Fort Pitt Bridge
Fort Pitt Bridge
Completion Date: 1958-11-04

The Ft. Pitt bridge has a length of 1,210' (369m), with a main arch span of 750'(229m) and a width of 62' (19m). The tie truss has four vehicular lanes on each deck. The bridge was erected sequentially on falsework bents both in the river and on...

Broadway Street Bridge
Broadway Street Bridge
Completion Date: 1956-09-07

Series of three back-to-back tied arches, two (2) 450 feet long and one (1) 540 feet long.

Wheeling Arch Bridge
Completion Date: 1955-08-01

Tied arch bridge and approaches.

Pasco Bridge over the Columbia River
Pasco Bridge over the Columbia River
Completion Date: 1954-08-31

American Bridge fabricated and erected the superstructure for this 2,450’, tied-arch, truss bridge with a 520’ main span and 325’ side spans in 1954. The approaches included cantilever and suspended construction. In addition, lighting and deck...

Items 33-36/54 displayed. prev | 4 | | 5 | | 6 | | 7 | | 8 | | 9 | | 10 | | 11 | | 12 | | 13 | next
 
 
© 2009 American Bridge Company