Home > Experience
 

About Us
Experience

    Featured Projects
    Current Projects
    Completed Projects
       - Arch
       - Cable Stay
       - Girder
       - Movable
       - Suspension
       - Truss
       - Marine
Media


Duluth Superior Interstate Bridge
Duluth Superior Interstate Bridge
Completion Date: 1960-12-16

Through cantilever with tied arch main span, 270-600-270', 82' rise.

Fort Duquesne Bridge
Fort Duquesne Bridge
Completion Date: 1960-11-04

The Ft. Duquesne Bridge has a length of 639' (195m), with a main arch span of 423' (129m) and a width of 62' (19m). The arch rise is 65' (20m). The tie truss has four vehicular lanes on each deck. The bridge was erected by building the entire tie...

Mohawk River Bridges
Completion Date: 1959-11-18

Dual (side by side) two-hinged through box girder arch spans of 600' with 3 by 35' beam span approaches on each side. Arch chords are 4' by 8'.

Mississippi River Bridge, South St. Paul, MN
Mississippi River Bridge, South St. Paul, MN
Completion Date: 1959-09-01

Dual tied arch bridges.

Items 29-32/54 displayed. prev | 3 | | 4 | | 5 | | 6 | | 7 | | 8 | | 9 | | 10 | | 11 | | 12 | next
 
 
© 2009 American Bridge Company