Rio Grande Bridge (Taos Gorge Bridge)
Completion Date: 1965-06-01
American Bridge fabricated three (3) steel truss spans for a new 1,272-foot arched deck truss bridge 650 feet over the Rio Grande River for the New Mexico Department of Transportation. The spans totaled 1,200 feet, with two 36-foot I-Beam... |
|
Cold Spring Canyon Bridge
Completion Date: 1963-12-27
This project involved the fabrication and erection of a 1,148' (350m) bridge with a 700' ((213m) box chord deck arch main span over a 400' (122m) gorge Northeast of Santa Barbara, CA. The bridge was erected using a special cableway designed by... |
|
Alexander Hamilton Bridge
Completion Date: 1962-12-10
Anchored deck arch bridge with 83' rise, two-span approach on Manhattan side, 170 feet, seven-span approach on Bronx side, 795 feet. |
|
Cart Creek Bridge
Completion Date: 1962-07-01
Erection of steel through arch bridge with a 550' (168m) span between thrust blocks, erected by cableway over a gorge 210' (64m) above the floor of the canyon at the time of construction. The 28' roadway hangs on 1-3/4" (35mm) cables. After... |
|